Useful Links

Arkansas Public Service Commission Net Metering Rules

Small Generators 0 to 20 Megawatts (Single or Multiple Units) & Not under Net Meter Rules

FERC Small Generator Rules (Order 2006) (PDF)

Large Generators Greater than 20 Megawatts

FERC Large Generator Rules (Order 2003-A) (PDF)

NERC Reliability Standards applicable to Generator Owner and/or Generator Operator

Co-Generation Qualifying Facility

Arkansas Public Service Commission Co-Generator Rules

Transmission Lines

The general study process used by Arkansas Electric Cooperative Corporation (AECC) will be similar to the one outlined in the FERC Small Generator Rules where applicable. Transmission interconnections may be subject to the Southwest Power Pool (SPP) Transmission Working Group Interconnection Review process and the Midcontinent Independent System Operator (MISO) Planning Sub Committee Interconnection Review Process. These processes can be found on the SPP Website and the MISO Website.

Loads

Contact the AECC member distribution cooperative for a copy of their Line Extension Policy.

Southwest Power Pool

SPP Website

SPP Oasis Website

Midcontinent Independent System Operator

MISO Website

MISO Oasis Website

AEP/SWEPCO

AEP Interconnection Guidelines

AEP Transmission Planning Reliability Criteria

OGE

OGE Interconnect Guidelines

SWPA

SWPA General Requirements for Interconnection

Entergy

Entergy Facility Connection Requirements page

Entergy Tariff Attachment N (Standard Large Generator Interconnection Procedures) (PDF)

Entergy Tariff Attachment O (Standard Large Generator Interconnection Agreement) (PDF)

FERC

Standard Interconnection Agreements and Procedures for Small Generators

PDFs

AECC Interconnection and Operating Guidelines / Requirements (PDF)